Project: Pluto LNG Plant

Brief
CRA was engaged prior to a major statutory shutdown by Woodside to repair damaged cables on all 24 Pluto LNG cranes.
Details
The work was a prerequisite prior to the shutdown or else they couldn’t be used. CRA has to deliver on time or else the shutdown would be delayed. The cables were both UV damaged and or sheared around entry boxes due to poor installation where the cables were bent under tension. CRA spent a month on site prior to the shutdown repairing the cables on all cranes. There was a combination of cable repair and coat utilising FS5. The job was done while Pluto LNG was operational and was done on time and under budget.
Outcome
Outcome: CRA was subsequently put on WOODSIDE’s approved vendor list and is currently assisting Woodside with scoping up work for KGP life extension programme and further work on Pluto LNG.